Construction

The Fountain Mall

Metalwork fabrication and installation.

Opposite Jubilee Complex, Nairobi

Construction

Project Overview

Metalwork fabrication and installation for The Fountain Mall, including structural steelwork, window frames, CNC decorations, balcony railings, doors, roofing and other architectural metalwork.

Fabricated at our Thika Superhighway workshop, delivered on our own fleet and installed by the same team that built it.

Scope of Work

  • Structural steelwork
  • Window frames
  • CNC decorations
  • Balcony railings
  • Doors
  • Roofing

How We Build

01Measure & DesignWe work from your measurements and drawings.
02FabricateCut, bent and welded in our Thika Superhighway workshop.
03FinishPowder coating or paint for a durable, clean look.
04Deliver & InstallDelivered on our own fleet and fitted by our team.

Ready to Start Your Project?

Get a free quote today. Send us your designs or specifications and we'll get back to you within 24 hours.

Chat on WhatsApp